Published April 1987 | Version v1
Report

Previous results from experimental operation of the plutonium test plant (PUTE)

  • 1. Kernforschungszentrum Karlsruhe G.m.b.H. (Germany, F.R.). Inst. fuer Heisse Chemie

Description

The test plant for the demonstration of the 1st uranium/plutonium separation cycle and the second cycle for plutonium purification, consisting of three pulsed screen floor columns and 2 electro-reoxidation cells was tested in 3 large campaigns with a throughput of a total of 270 kg of plutonium. There are reports on these campaigns and the working parameters examined in them. The electrolytic plutonium re-extraction in the Pu purification cycles was demonstrated with the best result and the complex processes in the pulsed column are understood. Regarding the U/Pu separation cycle, the ELKE column supplies sufficient separation factors, but the interpretation is not satisfactory yet and requires further experiments in representative conditions, for which the plant is being modified and expanded. (RB)

Abstract (German)

Die im wesentlichen aus drei pulsierten Siebbodenkolonnen und 2 Elektroreoxidationszellen bestehende Testanlage zur Demonstration des 1. Uran/Plutonium-Trennzyklus und des 2. Zyklus zur Pu-Reinigung wurde in 3 grossen Kampagnen erprobt mit insgesamt 270 kg Pu-Durchsatz. Hier wird ueber diese Kampagnen und die als Schwerpunkte darin untersuchten Betriebsparameter berichtet. Die elektrolytische Pu-Rueckextraktion in den Pu-Reinigungszyklen wurde mit bestem Ergebnis demonstriert und die komplexen Vorgaenge in der Pulskolonne im wesentlichen verstanden. Bezueglich des U/Pu-Trennzyklus liefert die Kolonne ELKE ausreichende Trennfaktoren, jedoch ist die Interpretation noch nicht befriedigend und erfordert weitere Versuche unter repraesentativen Bedingungen, fuer die die Anlage modifiziert und erweitert wird. (RB)

Additional details

Additional titles

Original title (German)
Bisherige Ergebnisse aus dem Versuchsbetrieb der Plutoniumtestanlage (PUTE)

Publishing Information

Imprint Title
Lectures of the 6th status report on the project for reprocessing and waste treatment on March 13th/14th 1986
Imprint Pagination
545 p.
Journal Page Range
p. 115-134.
Report number
KFK--4177

Conference

Title
6. status report of the Project Reprocessing and Waste Treatment (PWA) of Kernforschungszentrum Karlsruhe G.m.b.H.
Original Conference Title
6. Statusbericht des Projektes Wiederaufarbeitung und Abfallbehandlung (PWA) des Kernforschungszentrum Karlsruhe G.m.b.H
Dates
13-14 Mar 1986.
Place
Karlsruhe (Germany, F.R.).

INIS

Country of Publication
Germany
Country of Input or Organization
Germany
INIS RN
19016776
Subject category
S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
EFFICIENCY; ELECTROLYSIS; EXTRACTION COLUMNS; OXIDATION; PILOT PLANTS; PLUTONIUM; PULSES; REDUCTION; SOLVENT EXTRACTION; TESTING; URANIUM
Descriptors DEC
ACTINIDES; CHEMICAL REACTIONS; ELEMENTS; EQUIPMENT; EXTRACTION APPARATUSES; FUNCTIONAL MODELS; METALS; SEPARATION EQUIPMENT; SEPARATION PROCESSES; TRANSURANIUM ELEMENTS

Optional Information

Notes
Imprint:Sammlung der Vortraege anlaesslich des 6. Statusberichtes des Projektes Wiederaufarbeitung und Abfallbehandlung am 13./14. Maerz 1986.
Secondary number(s)
PWA--89/86.