Maintenance of nuclear power plants
Description
This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance operations are vital to maintain nuclear activity in terms of skills and know-how which is the concern of the 2 last articles. (A.C.)
Additional details
Additional titles
- Original title (French)
- La maintenance des centrales nucleaires
Publishing Information
- Journal Title
- Revue Generale Nucleaire
- Journal Issue
- no.1
- Journal Page Range
- p. 11-48
- ISSN
- 0335-5004
- CODEN
- RGNUDJ
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 47094680
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- BELLEVILLE-1 REACTOR; BELLEVILLE-2 REACTOR; ENERGY POLICY; FRANCE; LIFETIME EXTENSION; ORGANIZING; REACTOR MAINTENANCE
- Descriptors DEC
- DEVELOPED COUNTRIES; ENRICHED URANIUM REACTORS; EUROPE; GOVERNMENT POLICIES; LIFETIME; MAINTENANCE; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SERVICE LIFE; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WESTERN EUROPE
Optional Information
- Notes
- 10 refs.