Published 1982 | Version v1
Book

LWR risk management by safety R and D

  • 1. General Electric Co., Sunnyvale, CA

Description

This paper presents a methodology which has been developed for selecting LWR safety RandD projects. The methodology provides ranking of the RandD projects and the RandD budget allocation which minimizes public risk. The methodology contains procedures to identify institutional, organizational, legal, and contractual factors which affect the probabilities of success and use of RandD projects so that these factors can be evaluated and possibly managed.The methodology also contains a nonlinear optimization code to provide the optimum selection of RandD projects and evaluate the sensitivity of this selection to uncertainity in the input data. Application of the methodology to a test case has shown that: 1) commonly used schemes for ranking RandD projects do not necessarily lead to the optimum selection, and 2) the optimum selection is not necessarily strongly sensitive to uncertainty in the input data

Additional details

Publishing Information

Publisher
American Nuclear Society, Inc.
Imprint Place
La Grange Park, IL
Imprint Title
Probabilistic risk assessment
Journal Page Range
p. 343-352.

Conference

Title
ANS/ENS topical meeting on probabilistic risk assessment.
Dates
20-24 Sep 1981.
Place
Port Chester, NY (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
14783490
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY; S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BWR TYPE REACTORS; COST BENEFIT ANALYSIS; LEGAL ASPECTS; MATHEMATICAL MODELS; REACTOR SAFETY; RESEARCH PROGRAMS; RISK ANALYSIS
Descriptors DEC
ECONOMIC ANALYSIS; REACTORS; SAFETY; WATER COOLED REACTORS; WATER MODERATED REACTORS