Human Performance Issues Associated with the Use of Plant Procedures in Selected Operational Events

  • 1. Division of Reactor Controls and Human Factors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (United States)

Description

The United States Nuclear Regulatory Commission (NRC) monitors, reviews, and analyzes operational events at nuclear power plants in the United States and identifies pertinent human performance issues. The assessments resulting from these activities consistently show that plant procedures and associated reference documents play significant roles in many of the operating and shutdown events. Despite the recognized improvements in procedure generation and procedure implementation over recent years, these roles are frequently found to be root causes or important factors relating to events. In particular, procedures continue to play a significant role in event initiation. This paper describes several key human performance issues which are associated with plant procedures and are integral to event initiation scenarios at nuclear power plants in the United States. The following areas of weakness regarding procedures recently exhibited human performance concern and are of particular interest: (1) inadequacy of procedures; (2) failure of personnel to follow procedures (procedure adherence); (3) use of the wrong procedures; (4) failure to properly control or maintain procedures (5); and unintentional personnel error in the use of the correct procedures. These procedure-related human performance issues continue to occur at both Pressurized Water Reactor (PWR) and Boiling Water Reactor(BWR) facilities throughout the United States. In fact, 694 Licensee Event Reports (LERs) were submitted to the NRC regarding procedure-related events that occurred in 1996. Similarly, 278 procedure-related LERs were submitted in the first half of calendar year 1997. In particular, many of the procedure-related human performance problems are prevalent as initiators of both power operation and shutdown events, and frequently precipitate confusion in communications, aggravate system problems and delay recovery. The examples provided in this paper are associated with power reactor licensee events which occurred in 1996 and 1997. (author)

Files

44026274.pdf

Files (342.9 kB)

Name Size Download all
md5:c62e7fe0239d3ddbeafd66745c444b9c
342.9 kB Preview Download
Part of:
Proceedings from Specialists Meeting on human performance in operational events

Additional details

Publishing Information

Imprint Title
Proceedings from Specialists Meeting on human performance in operational events
Imprint Pagination
472 p.
Journal Page Range
p. 299-306
Report number
NEA-CSNI-R--1998-16

Conference

Title
Specialists Meeting on human performance in operational events
Dates
13-17 Oct 1997
Place
Chattanooga, Tennessee (United States)

Optional Information

Notes
10 refs.