Published December 2021 | Version v1
Miscellaneous Open

Status of the Project on Research Center for Nuclear Science and Technology and Proposing main research and application directions of the New Research Reactor

  • 1. Vietnam Atomic Energy Institute, 59 Ly Thuong Kiet, Hoan Kiem, Ha Noi (Viet Nam)
  • 2. Da Lat Nuclear Research Institute, 1 Nguyen Tu Luc, Da Lat, Lam Dong province (Viet Nam)

Description

The report presents the main features of the Center for Nuclear Science and Technology project with the main facility is a new Research Reactor (RR) of 10 MWt. The project has implemented on the basis of the Inter-Governmental Agreement between Vietnam and Russian Federation on the construction of the Center for Nuclear Science and Technology (CNST) in the territory of Vietnam, signed on November 21, 2011. According to the provisions of the current Laws of Vietnam, the project is a public investment project, so it must go through the following phases:Pre-feasibility study (Pre-FS) phase consists of: Screening and comparing potential sites to propose 3 candidate sites; Preliminary survey and evaluation of candidate sites to propose the most suitable one for the Feasibility study phase; Conceptual design of the project including the new RR; Prepare a Preliminary Environmental Impact Assessment (Pre-EIA) Report; and Prepare a Pre-Feasibility Study Report (Pre-FS) and submit it to the competent authorities for consideration. Based on those documents, the Prime Minister has approved the Investment Policy of the CNST Project by a Decision No. 75/QĐ-TTg dated November 19, 2018. Feasibility study (FS) phase consists of: Technical survey and evaluation of the site approved in the Investment Policy; Development of a Feasibility Study Report (FS Report), including basic design and Preliminary safety analysis report; Development of an EIA report; and preparing a Dossier for site approval for project construction. This phase is expected to be implemented in the period of 2022-2024. EPC implementation phase consist of: Technical design; Construction drawing design; Construction permit approval; and Procurement and construction implementation. Some of the main results of the Pre-FS phase as a basis for developing the Requirements Profile for the FS implementation will be presented in this report. (author)

Files

53125284.pdf

Files (139.7 kB)

Name Size Download all
md5:51995022e58647cf62c2722603c69eb9
139.7 kB Preview Download
Part of:
Vietnam Conference on Nuclear Science and Technology VINANST-14. Agenda and Abstracts

Additional details

Additional titles

Original title (Vietnamese)
Tinh hinh thuc hien du an trung tam nghien cuu khoa hoc cong nghe hat nhan va de xuat cac huong nghien cuu va ung dung chinh cua lo phan ung nghien cuu moi

Publishing Information

Imprint Title
Vietnam Conference on Nuclear Science and Technology VINANST-14. Agenda and Abstracts
Imprint Pagination
246 p.
Journal Page Range
2 p.
Report number
INIS-VN--005

Conference

Title
14. Vietnam Conference on Nuclear Science and Technology
Original Conference Title
Hoi nghi Khoa hoc va Cong nghe Hat nhan Toan quoc lan thu 14
Acronym
VINANST-14
Dates
9-10 Dec 2021
Place
Da Lat, Lam Dong (Viet Nam)

INIS

Country of Publication
Viet Nam
Country of Input or Organization
Viet Nam
INIS RN
53125284
Subject category
S07: ISOTOPES AND RADIATION SOURCES;
Resource subtype / Literary indicator
Conference
Descriptors DEI
BILATERAL AGREEMENTS; FEASIBILITY STUDIES; RESEARCH REACTORS
Descriptors DEC
AGREEMENTS; INTERNATIONAL AGREEMENTS; REACTORS; RESEARCH AND TEST REACTORS

Optional Information

Notes
Imprint:Conference program and paper abstracts only; Plenary Session;Do do phan ung bang ky thuat tieng on va ap dung trong lo Da Lat