Published December 1965 | Version v1
Miscellaneous Open

Annual report of the mechanics group

Creators

  • 1. Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia)

Description

Planned maintenance and repair of fundamental reactor systems was done during planned shut down periods in 1965. For that reason there was no interruption of reactor operation caused by failures of the equipment. Planned repairs were concerned with: heavy water system, gas system, technical water system, distillation system, graphite cooling system, ventilation and heating systems and emergency power supply system in the reactor building. This report includes as well, the list of unplanned repairs

Abstract (Serbian)

U 1965. godini vrsen je planski remont osnovnih agregata reaktorskih sistema u planiranim periodima stajanja reaktora, te nije doslo ni do kakvih duzih prekida rada reaktora usled kvarova na opremi. Planski remont obuhvatio je: sistem teske vode, gasni sistem, sistem tehnicke vode, sistem destilacije, sistem hladjenja grafita, sistem ventilacije i grejanja, transportne uredjaje, dizel agregata. Ovaj izvestaj sadrzi i listu vanplanskih remonta i popravki

Files

41124153.pdf

Files (1.6 MB)

Name Size Download all
md5:d50b801904c8c1bc009693ac7436f170
1.6 MB Preview Download
Part of:
Annual report of the maintenance division for 1965

Additional details

Additional titles

Original title (Serbian)
Godisnji izvestaj masinske grupe

Publishing Information

Imprint Place
Beograd-Vinca (Serbia)
Imprint Title
Annual report of the maintenance division for 1965
Imprint Pagination
236 p.
Journal Page Range
50 p.
Report number
INIS-CS--0065

Optional Information

Notes
2 tabs; This record replaces 37118472 Imprint:17 tabs, 13 figs, 5 refs;Godisnji izvestaj Odelenja odrzavanja za 1965. g.
Secondary number(s)
RA--214/R3/P3/58/08