EPR fuel cycle cost reduction

  • 1. Framatome, 92 - Courbevoie (France)
  • 2. Siemens Germany (Germany)
  • 3. NPI France (France)

Description

The EPR is a 1500 MWe evolutionary PWR which entered its ''Basic Design phase'' in February 1995, after a ''Consolidation phase'' of two years where the main features were harmonized between all the involved French and German industrial partners. The core of the EPR is designed to reach significant advantages with respect to its flexibility and its fuel cycle costs compared to PWRs already in operation. The reduced fuel cycle costs are reached on the basis of adequate decisions with respect to the core geometry and optimized fuel utilization. Additional margins remain available for following the fuel cycle length to be selected in a range between one and two years and, if requested, to switch over to mixed oxide fuels (MOX) managements with a MOX ratio of up to 50 percent. (authors)

Part of:
TOPNUX 96. Economic Nuclear Power for the 21st. century. Towards the new generation of reactors. V. 2

Additional details

Additional titles

Original title (French)
EPR: reduction du cout du cycle du combustible

Publishing Information

Publisher
Societe Francaise d'Energie Nucleaire (SFEN).
Imprint Place
Paris (France)
Imprint Title
TOPNUX 96. Economic Nuclear Power for the 21st. century. Towards the new generation of reactors. V. 2
Imprint Pagination
652 p.
Journal Page Range
p. 571-580.

Conference

Title
SFEC/ENS International conference.
Dates
30 Sep - 2 Oct 1996.
Place
Paris (France).

Optional Information

Notes
Imprint:TONUX 96. Une energie economique pour le 21eme siecle: la nouvelle generation de reacteurs nucleaires. V. 2.