Published 2004
| Version v1
Book
Data taking system of the RF measurement at KEK e-/e+ injector linac
Creators
- 1. High Energy Accelerator Research Oraganization, Tsukuba, Ibaraki (Japan)
Description
KEK injector linac provides e-/e+ beam to four rings (PF, PF-AR, KEKB LER, KEKB HER) and the operation time exceeds 7,000 hours a year. About 60 high-power klystrons are used for the beam acceleration and stable rf operation is essential to the beam quality. In case of the serious troubles related to the total rf system (such as rf windows, SLED's and accelerating structures), the quick failure-analysis is expected especially at the continuous injection mode since January, 2004. Automatic data-taking is inevitable because of the large number of the klystrons and the limited number of the human resource. In this report, some examples of the data-taking system are summarized. (author)
Additional details
Publishing Information
- Publisher
- Particle Accelerator Society of Japan
- Imprint Place
- Tokyo (Japan)
- Imprint Title
- Proceedings of the 1st annual meeting of Particle Accelerator Society of Japan and the 29th Linear Accelerator Meeting in Japan
- Imprint Pagination
- 717 p.
- Journal Page Range
- p. 263-265
Conference
- Title
- 1. annual meeting of Particle Accelerator Society of Japan; 29. Linear Accelerator Meeting in Japan
- Dates
- 4-6 Aug 2004
- Place
- Funabashi, Chiba (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 36037527
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BEAM INJECTION; DATA ACQUISITION SYSTEMS; ELECTRON BEAMS; KEK LINAC; KLYSTRONS; OPERATION; PERFORMANCE TESTING; POSITRON BEAMS; RF SYSTEMS; STORAGE RINGS
- Descriptors DEC
- ACCELERATORS; BEAMS; ELECTRON TUBES; ELECTRONIC EQUIPMENT; EQUIPMENT; LEPTON BEAMS; LINEAR ACCELERATORS; MICROWAVE EQUIPMENT; MICROWAVE TUBES; PARTICLE BEAMS; TESTING
Optional Information
- Notes
- 4 refs., 7 figs.