Repository Drift Backfilling Demonstrator

  • 1. Agence Nationale pour la Gestion des Dechets Radioactifs (ANDRA), 92 - Chatenay Malabry (France)

Description

The 'Backfilling Demonstrator' is one of the technological demonstrators developed by ANDRA in the framework of the feasibility studies for a geological repository for high-level long-lived (HL-LL waste) within a clay formation. The demonstrator concerns the standard and supporting backfills as defined in Andra's 2005 design. The standard backfill is intended to fill up almost all drifts of the underground repository in order to limit any deformation of the rock after the degradation of the drift lining. The supporting backfill only concerns a small portion of the volume to be backfilled in order to counter the swelling pressure of the swelling clay contained in the sealing structures. The first objective of the demonstrator was to show the possibility of manufacturing a satisfactory backfill, in spite of the exiguity of the underground structures, and of reusing as much as possible the argillite muck. For the purpose of this experiment, the argillite muck was collected on Andra's work-site for the implementation of an underground research laboratory. Still ongoing, the second objective is to follow up the long-term evolution of the backfill. Approximately 200 m3 of compacted backfill material have been gathered in a large concrete tube simulating a repository drift. The standard backfill was manufactured exclusively with argillite. The supporting backfill was made by forming a mixture of argillite and sand. Operations were carried out mostly at Richwiller, close to Mulhouse, France. The objectives of the demonstrator were met: an application method was tested and proven satisfactory. The resulting dry densities are relatively high, although the moduli of deformation do not always reach the set goal. The selected objective for the demonstrator was a dry density corresponding to a relatively high compaction level (95% of the standard Proctor optimum [SPO]), for both pure argillite and the argillite-sand mixture. The plate-percussion compaction technique was used and proved satisfactory. The measured dry densities are higher than the 95%-SPO objective. The implementation rates remain very low due to the experimental conditions involved. The metal supply mode would need to be revised before any industrial application is contemplated. The Demonstrator Program started in August 2004 and is followed up today over the long term. With that objective in mind, sensors and a water-saturation system have been installed. (author)

Availability note (English)

Available from: WM Symposia, 1628 E. Southern Avenue, Suite 9 - 332, Tempe, AZ 85282 (US); also available online at: http://www.wmsym.org/archives/2008/search.html

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
INIS-US--10-WM-08010

Conference

Title
Waste Management Symposium 2008 - HLW, TRU, LLW/ILW, Mixed, Hazardous Wastes and Environmental Management - Phoenix Rising: Moving Forward in Waste Management
Acronym
WM'08
Dates
24-28 Feb 2008
Place
Phoenix, AZ (United States)

Optional Information

Notes
13 refs.