Published 1996
| Version v1
Book
Interim safe-storage of the Hanford 105-C reactor
Creators
- 1. Dept. of Energy, Richland, WA (United States)
- 2. Bechtel Hanford, Inc., Richland, WA (United States)
- 3. Delphinus Engineering, Inc., Philadelphia, PA (United States)
Description
Engineering and planning has been initiated to determine the feasibility of reducing the 105-C reactor building footprint to a size adequate to ensure containment of any radioactive and hazardous materials that may escape from the reactor but still have access to areas around the reactor for surveillance purposes. The general concept is to remove the building structure such that the massive shield walls surrounding the reactor become the outside walls of the remaining building. A new roof system would be placed over the reactor using the shield walls for support
Additional details
Publishing Information
- Publisher
- American Nuclear Society, Inc.
- Imprint Place
- La Grange Park, IL (United States)
- Imprint Title
- Proceedings of the international topical meeting on nuclear and hazardous waste management (SPECTRM '96): Volume 3
- Imprint Pagination
- 843 p.
- Journal Page Range
- p. 1809-1814.
Conference
- Title
- international conference on nuclear and hazardous waste management.
- Acronym
- SPECTRUM '96
- Dates
- 18-23 Aug 1996.
- Place
- Seattle, WA (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 28050352
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- HANFORD PRODUCTION REACTORS; REACTOR DECOMMISSIONING
- Descriptors DEC
- DECOMMISSIONING; PLUTONIUM PRODUCTION REACTORS; PRODUCTION REACTORS; REACTORS
Optional Information
- Secondary number(s)
- CONF-960804--Vol.3.