Guidance of reactor operators and TSC personnel with the severe accident management guidance under shutdown and low power conditions
Creators
- 1. Westinghouse Electric Systems Europe S.A., Brussels (Belgium)
Description
The Westinghouse Owners Group Severe Accident Management Guidance (WOG SAMG) was developed between 1991 and 1994. The primary goals for severe accident management that form the basis of the WOG SAMG are to terminate any radioactive releases to the environment; to prevent failure of any containment fission product boundary and to return the plant to a controlled stable condition. The WOG SAMG is primarily a TSC tool for mitigation of low probability core damage events. The philosophy is that control room operators should remain focused on the prevention of core damage, whereas the TSC personnel should concentrate on the mitigation of the severe accident. The symptom based package is built up as a structured process for choosing appropriate actions based on actual plant conditions. No detailed knowledge of severe accident phenomena is required. The scope of the WOG SAMG is limited to severe accidents resulting from initiating events occurring during full power operation. However, a number of studies such as the EdF EPS 1300 Probabilistic Safety Assessment (PSA), the shutdown Probabilistic Risk Assessment (PRA) for Surry, the BERA shutdown PRA for Beznau, the EPRI/ Westinghouse ORAM methodology etc. have shown that the frequency of core damage (a severe accident) during shutdown and low power operation can be of the same order of magnitude as for full power operation. The at-power SAMG is viewed as the resolution of the severe accident issue. Similarly, it is expected that as shutdown PRAs mature, the final resolution of the severe accident issue will lie in SAMG for low power and shutdown operation. Therefore in resolution of this issue, Westinghouse has developed the Shutdown Severe Accident Management Guidance (SSAMG) which gives guidance for both control room and TSC personnel to mitigate a severe accident under shutdown or low power conditions. In the last few years, many LWR plants have been implementing SAMG. In the US, all plants have developed SAMG, and many have used the WOG SAMG as a basis. Shutdown SAMG has not been developed yet for any specific site; however, the Koeberg plant in South-Africa is committed to implement it, and has begun a project which will be completed probably by the end of this year. The purpose of this paper is to provide some insights on how SSAMG can aid operators and especially TSC personnel in the mitigation of a severe accident during low power and shutdown operation. (author)
Files
34087557.pdf
Files
(935.9 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:f58388128ad0bc73dba89c27d6e55fe9
|
935.9 kB | Preview Download |
Additional details
Publishing Information
- Publisher
- Inst. Jozef Stefan; Nuclear Society of Slovenia
- Imprint Place
- Ljubljana (Slovenia)
- ISBN
- 961-6303-29-5
- Imprint Title
- Proceedings of the 2000 International Conference on Nuclear Energy in Central Europe
- Imprint Pagination
- 13.8 Megabytes
- Journal Page Range
- [8 p.]
- Report number
- INIS-SI--03-002
Conference
- Title
- International Conference Nuclear Energy in Central Europe 2000
- Dates
- 11-14 Sep 2000
- Place
- Bled (Slovenia)
INIS
- Country of Publication
- Slovenia
- Country of Input or Organization
- Slovenia
- INIS RN
- 34087557
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ADMINISTRATIVE PROCEDURES; IRRADIATION PROCEDURES; MANAGEMENT; PERSONNEL MANAGEMENT; PROBABILISTIC ESTIMATION; REACTOR ACCIDENTS; REACTOR CORE DISRUPTION; REACTOR SHUTDOWN
- Descriptors DEC
- ACCIDENTS; MANAGEMENT; REACTOR ACCIDENTS; SHUTDOWN
Optional Information
- Notes
- 6 refs. Imprint:726 refs., 125 tabs., 557 figs.