Published 2009 | Version v1
Miscellaneous Open

Test and implementation of position sensors on load and unload [18O]H2O control valve of the target used in 18F - production by proton irradiation

  • 1. Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

Description

The radionuclide 18F used to produce the radiopharmaceutical [18F]FDG has 109.7 min of half-life, becoming your productive chain so peculiar, because since the beginning of [18O]H2O irradiation until the PET-CT exam there is a period about six hours, and any procedure fail in the productive chain will result in a delay to the PET CT exam. The absence of the position signs from [18O]H2O load and unload valve of the target may result in 18F production loss and even area contamination around the target. In this paper, three types of position sensors, into cyclotron radionuclides production environment in Cyclotron Accelerator Center from IPEN-CNEN/SP were tested. The tests were an indicative to discover the fitter sensor to the [18O]H2O load and unload valve from target used in [18F]fluoride production. After finding the fitter sensor, it was implemented in 18F- target, supplying the correct position from [18O]H2O load and unload valve to programmable logic controller, that had the software modified, respecting in this way the valve position. By this way, it was possible to reduce the incidence of fails, increasing the reliability in [18F]FDG productive chain. (author)

Availability note (English)

Available from INIS in electronic form

Files

40106337.pdf

Files (2.5 MB)

Name Size Download all
md5:a33bac66ebe406e1c57a245da8ce1c61
2.5 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
[8 p.]
Report number
INIS-BR--6311

Conference

Title
International nuclear atlantic conference. Innovations in nuclear technology for a sustainable future; 16. Brazilian national meeting on reactor physics and thermal hydraulics; 9. Brazilian national meeting on nuclear applications; 1. Meeting on nuclear industry
Acronym
INAC 2009
Dates
27 Sep - 2 Oct 2009
Place
Rio de Janeiro, RJ (Brazil)

Optional Information

Notes
8 refs., 10 figs. Published only in CD-Rom. Code: e08_77_fullpaper.pdf