Published July 1994
| Version v1
Report
Open
The magnets for extraction from the KEK proton synchrotron main ring
Description
Fast extraction from the KEK proton synchrotron main ring started at December 1976 and ended at June 1981 with ending the experiments to use the KEK 1m Bubble Chamber. On the other hand, slow extraction from the KEK proton synchrotron main ring started at November 1977 and the first stage on the slow extraction ended at May 1990 with changing the flat-top duration from about 0.65 second to about 2 second. We made most magnets for extraction from the KEK proton synchrotron main ring, but we don't report about these magnets until now. As we think that compiling the materials of the extraction's magnets is useful, we publish this report. (author)
Availability note (English)
MF available from INIS under the Report Number.Files
26011060.pdf
Files
(461.0 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:3895c3f9bb3e9f92dcabcb43760589b5
|
461.0 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 16 p.
- Report number
- KEK--94-4
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 26011060
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- BEAM EXTRACTION; GEV RANGE 10-100; KEK SYNCHROTRON; KICKER MAGNETS; MAGNET COILS; MAGNET CORES; PROTON BEAMS; SEPTUM MAGNETS; SUPPORTS
- Descriptors DEC
- ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; ELECTRIC COILS; ELECTRICAL EQUIPMENT; ENERGY RANGE; EQUIPMENT; GEV RANGE; MAGNETS; MECHANICAL STRUCTURES; NUCLEON BEAMS; PARTICLE BEAMS; SYNCHROTRONS