Published March 2017 | Version v1
Journal article

The failure cause and solution for the position of fuelling machine ram B

Creators

  • 1. Nuclear Power Operations Management Co., Ltd., CNNP, Haiyan (China)

Description

Since pressurized heavy water reactor (PHWR) put into operation, fueling machine ram B had experienced failure for many times, which further cause fueling interruption, schedule change, even overpressure of fueling machine and D2O leaking when the channel is closed. These article analyses the root cause of ram B failure, with emphasis on main components of bellow, speed reducer, mechanical counter, and potentiometer. Regarding the failure cause, improvement measures are put forward in this article, and thus position failure is reduced significantly. (author)

Additional details

Identifiers

Publishing Information

Journal Title
China Nuclear Power
Journal Volume
10
Journal Issue
1
Journal Page Range
p. 39-45
ISSN
1674-1617

Optional Information

Notes
7 figs., 6 refs.; http://dx.doi.org/10.12058/zghd.2017.01.012