Published January 2004 | Version v1
Miscellaneous

Operation of the BR2 reactor

Description

The BR2 materials testing reactor is one of SCK-CEN's most important nuclear facilities. After an extensive refurbishment of 22 months to compensate for the ageing of the installation to enhance the reliability of operation and to comply with today's safety standards, the reactor was restarted in April 1997. In 2003, the reactor was operated for a total of 119 days at a mean power of 53 MW. The reactor was operated with an availability of 97.81 percent. One interruption of operation was recorded due to the reactor protection system and caused a delay of two days (xenon poisening) in the operation schedule. Sic ead test assemblies with 73% enriched uranium and a higher uranium density in the meat to maintain the nominal 235U content were irradiated for 4 cycles and reached a burn-up of 50 percent

Part of:
Scientific Report 2003

Additional details

Identifiers

Publishing Information

Publisher
Belgian Nuclear Research Center SCK-CEN, Mol (BE)
Imprint Place
Mol (Belgium)
Imprint Title
Scientific Report 2003
Imprint Pagination
140 p.
Journal Page Range
p. 82-83
Report number
INIS-BE--0008

Optional Information

Notes
The abstract is a contribution to the 2003 Scientific Report of the Belgian Nuclear Research Centre SCK-CEN