Treatment system for contaminated water in Fukushima of Areva

Creators

Description

The Great East Japan earthquake and following tsunami that occurred on March 11, 2011 resulted in a very difficult situation on the site of the Fukushima Dai-Ichi NPP, TEPCO was facing a very difficult challenge to cool down the reactors. Following the implementation of an open circuit reactor cooling using seawater mixed seawater and freshwater began to accumulate in the basements of the reactors and turbine building on site. This eater was highly contaminated at different levels, due to contact with damaged fuel elements and contaminated elements. Despite efforts to increase water storage capacity, it was estimated that in end of June 2011, water would ever flow as storage capacity would be reached. The site was urgently in needed of a water decontamination system that would greatly reduce the activity of the water. This would allow a recirculation to cool the reactors, reduce the water storage needs and facilitate access for other site remediation operations by decreasing the activity on site. Quality of water to be processed was estimated at about 100,000 tons with contamination level reaching 1Ci/L. (Author)

Additional details

Additional titles

Original title (Spanish)
Sistema de tratamiento de agua contaminada en Fukushima de Areva

Publishing Information

Journal Title
Nuclear Espana (1996)
Journal Volume
327
Journal Page Range
p. 32-34