Published 2007
| Version v1
Miscellaneous
Full load rejection procedure for Point Lepreau GS
Creators
- 1. Point Lepreau Generating Station, Lepreau, New Brunswick (Canada)
Description
In 1999 WANO issued Significant Operating Event Report 99-01 recommending that the industry verify whether or not currently approved procedures were adequate for a loss or degradation of the electrical grid. A detailed review identified that the procedures available at the time were not adequate to respond effectively to such a disturbance. Operations personnel reviewed operating expectations and the expected plant response to a Loss of Grid and updated the Operating Manual to cover 'Full Load Rejection'. Operations used the simulators to validate the procedure and train crews and Licensed staff. The revised documentation was approved and implemented. (author)
Additional details
Publishing Information
- Publisher
- Canadian Nuclear Society
- Imprint Place
- Toronto, Ontario (Canada)
- ISBN
- 0-919784-88-7
- Imprint Title
- Embracing the future: Canada's nuclear renewal and growth. 28th annual conference of the Canadian Nuclear Society and 31st CNS/CNA student conference
- Imprint Pagination
- 303 Megabytes
- Journal Page Range
- [10 p.]
Conference
- Title
- Canada's nuclear renewal and growth
- Acronym
- 28. Annual conference of the Canadian Nuclear Society and 31. CNS/CNA student conference on embracing the future
- Dates
- 3-6 Jun 2007
- Place
- Saint John, New Brunswick (Canada)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 38107448
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ELECTRIC POWER; ELECTRIC POWER INDUSTRY; OUTAGES; POWER DISTRIBUTION; SIMULATION
- Descriptors DEC
- INDUSTRY; POWER
Optional Information
- Notes
- Paper T6001.