Start-up and adjustment of the K-1000-60/1500-2 turbine plant for the 1000 MW unit at the Zaporozhe NPP

Description

Main stages and results of start-up and adjustment of the main K-1000-60/1500-2 turbine plant at the Zaporozhe NPP first unit are presented. Drawbacks of equipment as well as introduced and proposed measures related to their elimination are reflected. Brief characteristics of the main and auxiliary turbine plant equipment operation are presented