Published November 1989
| Version v1
Journal article
Start-up and adjustment of the K-1000-60/1500-2 turbine plant for the 1000 MW unit at the Zaporozhe NPP
Description
Main stages and results of start-up and adjustment of the main K-1000-60/1500-2 turbine plant at the Zaporozhe NPP first unit are presented. Drawbacks of equipment as well as introduced and proposed measures related to their elimination are reflected. Brief characteristics of the main and auxiliary turbine plant equipment operation are presented
Additional details
Additional titles
- Original title (Russian)
- Пуск и наладка турбоустановки К-1000-60/1500-2 энергоблока 1000 MW Запорожской AEhS
Publishing Information
- Journal Title
- Teploehnergetika
- Journal Issue
- no.11
- Series
- Teploehnergetika.
- ISSN
- 0040-3636
- CODEN
- TPLOA
INIS
- Country of Publication
- Russian Federation
- Country of Input or Organization
- USSR
- INIS RN
- 21076160
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- FLOWSHEETS; PERFORMANCE TESTING; SECONDARY COOLANT CIRCUITS; STEAM TURBINES; ZAPOROZHE-1 REACTOR
- Descriptors DEC
- COOLING SYSTEMS; DIAGRAMS; ENRICHED URANIUM REACTORS; INFORMATION; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTORS; TESTING; THERMAL REACTORS; TURBINES; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS