Published January 15, 1986
| Version v1
Report
Restricted
Economic benefits of power factor correction at a nuclear facility
Description
The economic benefits of correcting poor power factor at an operating nuclear facility are shown. A project approach for achieving rapid return of investment without disrupting plant availability is described. Examples of technical problems associated with using capacitors for power factor correction are presented
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE86009413.
Files
Additional details
Publishing Information
- Imprint Pagination
- 5 p.
- Report number
- HEDL-SA--3480-FP
Conference
- Title
- IEEE Power Engineering Society summer meeting.
- Dates
- 20-25 Jul 1986.
- Place
- Mexico City (Mexico).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 17089611
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CORRECTIONS; COST BENEFIT ANALYSIS; ECONOMICS; ELECTRIC POWER; FFTF REACTOR; NUCLEAR FACILITIES
- Descriptors DEC
- ECONOMIC ANALYSIS; EPITHERMAL REACTORS; FAST REACTORS; LIQUID METAL COOLED REACTORS; POWER; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; SODIUM COOLED REACTORS; TEST FACILITIES; TEST REACTORS
Optional Information
- Secondary number(s)
- CONF-860705--2.