Published October 2002 | Version v1
Miscellaneous

Rootcause analysis for the violation of surveillance Q(z)

  • 1. Korea Nuclear Fuel Company, Taejon (Korea, Republic of)

Description

At the beginning of UCN Unit 2 Cycle 11, there was a violation of surveillance Q(z) limits specified in the Technical Specification, which led to reduction in power level and the reduction of RAOC AFD band. In this study, the cause has been analyzed by reviewing of the measured power distribution and design data. It is found that the major cause was the increase in axial power at top half of the core resulted from the AOA(Axial Offset Anomaly) of previous cycle. Also, in spite of the higher peak power at top half of the core(6∼8ft) during rod insertion which is caused by the shallower insertion of the lead bank rather than Westinghouse 17x17 plants, the lower Q(z) limit compared with other plants is another cause

Part of:
Proceedings of the KNS autumn meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Taejon (Korea, Republic of)
Imprint Title
Proceedings of the KNS autumn meeting
Imprint Pagination
[CD-ROM]
Journal Page Range
[9 p.]

Conference

Title
2002 autumn meeting of the KNS
Dates
24-25 Oct 2002
Place
Yongpyoung (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
34063454
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CONTROL ELEMENTS; DESIGN; INSPECTION; POWER DISTRIBUTION; SPECIFICATIONS; ULCHIN-1 REACTOR; ULCHIN-2 REACTOR; VIOLATIONS
Descriptors DEC
ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
2 refs, 8 figs