Reliability of 2-out-of-3 system considering number of spares and exchange time
Creators
- 1. Japan Atomic Energy Research Inst., Tokai, Ibaraki. Tokai Research Establishment
Description
The reliability of a simplified model of ractor instrumentation possessing redundancy in its system is studied. The unreliability is obtained for a 2-out-of-3 system with a limited number of spare units, for the case where the replacement of the failed unit by a spare unit is not instantaneous. Two methods for the solution are obtained. The results are then compared with that obtained from Jacobs' formula for a rate of false scrams, and the accuracy of Jacobs' formula is discussed. It is shown that Jacobs' formula can be used only when the duration of operation is larger than several times the reset time, which must be a constant. But in actuality this reset time depends on such factors as the number of spare units provided, and the time required for replacement.
Additional details
Identifiers
- DOI
- 10.3327/jnst.8.696;
Publishing Information
- Journal Title
- Journal of Nuclear Science and Technology
- Journal Volume
- 8
- Journal Issue
- 12
- Series
- J. Nucl. Sci. Technol. (Tokyo).
- Journal Page Range
- 696-702
- ISSN
- 1881-1248
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 3022000
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ACCURACY; CONTROL ROD DRIVES; FAILURES; IN CORE INSTRUMENTS; JACOBIAN FUNCTION; REACTOR OPERATION; RELIABILITY; REPAIR; SCRAM; TIME DEPENDENCE
- Descriptors DEC
- FUNCTIONS; OPERATION; REACTOR SHUTDOWN
Optional Information
- Notes
- Updated automatically by Metadata and Full-Text Enrichment Agent