HIGHLY ENRICHED URANIUM BLEND DOWN PROGRAM AT THE SAVANNAH RIVER SITE PRESENT AND FUTURE

Description

The Department of Energy (DOE) and Tennessee Valley Authority (TVA) entered into an Interagency Agreement to transfer approximately 40 metric tons of highly enriched uranium (HEU) to TVA for conversion to fuel for the Browns Ferry Nuclear Power Plant. Savannah River Site (SRS) inventories included a significant amount of this material, which resulted from processing spent fuel and surplus materials. The HEU is blended with natural uranium (NU) to low enriched uranium (LEU) with a 4.95% 235U isotopic content and shipped as solution to the TVA vendor. The HEU Blend Down Project provided the upgrades needed to achieve the product throughput and purity required and provided loading facilities. The first blending to low enriched uranium (LEU) took place in March 2003 with the initial shipment to the TVA vendor in July 2003. The SRS Shipments have continued on a regular schedule without any major issues for the past 5 years and are due to complete in September 2008. The HEU Blend program is now looking to continue its success by dispositioning an additional approximately 21 MTU of HEU material as part of the SRS Enriched Uranium Disposition Project

Availability note (English)

Available from http://sti.srs.gov/fulltext/WSRC-TR-2008-00025.pdf; PURL: https://www.osti.gov/servlets/purl/933163-1W9oJq/

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
WSRC-TR--2008-00025

Conference

Title
INMM 49th Annual Conference
Dates
13-17 Jul 2008
Place
Nashville, TN (United States)

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Funding organization
US Department of Energy (United States)