Performance analysis on the operation of SMART main coolant pump 1 stop
Description
With TASS/SMR code, performance analyses have been performed on the MCP 1 stop operation of SMART. According to the performance analysis considering 100% power level of BOC condition, delay time of measuring instruments, control logic for the event scenario and some assumptions, major system parameters, including system pressure, inlet temperature of primary steam generator, outlet steam of secondary steam generator and etc., were maintained within the allowable criteria. The coolant temperature of core node was also maintained quite below saturated condition. In addition, under MOC and EOC conditions, performance analyses on the MCP 1 stop operation have been performed. Under MOC and BOC conditions, the allowable criteria on major parameters were not violated, and the trends of the parameters were analyzed to be similar to those of BOC condition
Additional details
Publishing Information
- Publisher
- KNS
- Imprint Place
- Taejon (Korea, Republic of)
- Imprint Title
- Proceedings of the Korean Nuclear Society autumn meeting
- Imprint Pagination
- [CD-ROM]
- Journal Page Range
- [15 p.]
Conference
- Title
- 2001 autumn meeting of the Korean Nuclear Society
- Dates
- 24-26 Oct 2001
- Place
- Seoul (Korea, Republic of)
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 33065441
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- COOLANTS; PERFORMANCE; PUMPS; PWR TYPE REACTORS; REACTOR OPERATION; STEAM GENERATORS; T CODES
- Descriptors DEC
- BOILERS; COMPUTER CODES; ENRICHED URANIUM REACTORS; EQUIPMENT; OPERATION; POWER REACTORS; REACTORS; THERMAL REACTORS; VAPOR GENERATORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 6 refs, 19 figs, 2 tabs