Published 1981 | Version v1
Journal article

PDX operating controls

  • 1. Princeton Univ, NJ, USA

Description

The Poloidal Divertor experiment began operation in November 1978. Some of the operating controls were in working condition a year before that date for power tests. In fact, a very similar system to the one used for PDX operated the FM-1 experiment as early as 1971. The functional block diagram of the PDX operating controls is shown. The operating console provides the man-machine interface during the experiment. Most status lights and pushbotton controls are directly interfaced to the IBM 1800 computer. This computer in conjunction with an IPC-300 programmable controller and a CAMAC serial highway system, performs the supervisory and control functions associated with the various PDX subsystems

Additional details

Publishing Information

Journal Title
Proc. Symp. Eng. Probl. Fusion Res.
Journal Issue
p. 928-931
Series
Proc. Symp. Eng. Probl. Fusion Res.
ISSN
0145-5958

Conference

Title
9. symposium on engineering problems of fusion research.
Dates
26 - 29 Oct 1981.
Place
Chicago, IL (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
14766328
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
CAMAC SYSTEM; DATA TRANSMISSION; ON-LINE CONTROL SYSTEMS; PDX DEVICES; REACTOR OPERATION
Descriptors DEC
COMMUNICATIONS; CONTROL SYSTEMS; ON-LINE SYSTEMS; OPERATION

Optional Information

Secondary number(s)
CONF-811040--.