Published 2012 | Version v1
Report Open

Ageing Management Review of the reactor pressure vessels in Laguna Verde NPP

  • 1. Comision Federal de Electricidad (Mexico)
  • 2. Instituto Nacional de Investigaciones Nucleares (ININ), Departamento de Tecnologia de Materiales. Carretera Mexico-Toluca Km. 36.5, Ocoyoacac Edo. de Mexico, C.P 5275 (Mexico)

Description

In the present paper, for both units of Laguna Verde Nuclear Power Plant (LVNPP), the Ageing Management Review of the reactor pressure Vessel was carried out, including the identification of the intended functions, the materials and the environments. The evaluation of the ageing effect/mechanism and the Aging management programs currently implemented were prepared. The most important aging effects/ mechanisms are: loss of fracture toughness due to neutron irradiation embrittlement, fatigue, stress corrosion cracking (SCC), general corrosion and erosion-corrosion. The neutron irradiation embrittlement is managed by the reactor vessel materials surveillance program. The fatigue is a Time Limited Aging Analysis (TLAA), for which is necessary to calculate some fatigue usage factors. SCC is managed by, the In service inspections (ISI) program, but also by the Water Chemistry program, including, currently, On Line Noble Chem. The water chemistry program also manages General Corrosion and erosion-corrosion. The results were compared with the GALL report. (author)

Files

43070825.pdf

Files (1.5 MB)

Name Size Download all
md5:865a0a72328a2febee0d64c135e16089
1.5 MB Preview Download
Part of:
3. International Conference on Nuclear Power Plant Life Management (PLiM) for Long Term Operations (LTO). Keynotes, papers, presentations, posters

Additional details

Publishing Information

Imprint Title
3. International Conference on Nuclear Power Plant Life Management (PLiM) for Long Term Operations (LTO). Keynotes, papers, presentations, posters
Imprint Pagination
vp.
Journal Page Range
23 p.
Report number
IAEA-CN--194

Conference

Title
3. International Conference on Nuclear Power Plant Life Management (PLiM) for Long Term Operations (LTO)
Dates
14-18 May 2012
Place
Salt Lake City, Utah (United States)

Optional Information

Notes
Full paper; 2 figs, 3 tabs, 9 refs
Secondary number(s)
IAEA-CN--194-024