Experience with V-1 nuclear power plant operation
Description
The physical and power start-ups of the V-1 nuclear power plant are described. The physical start-up reached the aim preset in the schedule and confirmed the designed values. The power start-up confirmed that the primary coolant circuit had higher operating reliability than the secondary circuit. A list is given of shortcomings and failures of the secondary coolant circuit. The chemical regime of the primary circuit was stable, without significant deviations. The chemical regime of the secondary circuit was burdened with a number of failures. In spite of the said problems, the V-1 plant operated reliably. (J.B.)
Additional details
Additional titles
- Original title (Slovak)
- Skusenosti z prevadzky JE V-1
Publishing Information
- Imprint Title
- Nuclear power day
- Imprint Pagination
- 80 p.
- Journal Page Range
- p. 46-50.
Conference
- Title
- Nuclear power day.
- Dates
- 15 Apr 1981.
- Place
- Rez (Czechoslovakia).
INIS
- Country of Publication
- Serbia and Montenegro
- Country of Input or Organization
- Serbia and Montenegro
- INIS RN
- 14742963
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BOHUNICE V-1 REACTOR; LEAKS; PERFORMANCE TESTING; REACTOR FUELING; REACTOR OPERATION; REACTOR START-UP; RELIABILITY; SECONDARY COOLANT CIRCUITS; WATER CHEMISTRY
- Descriptors DEC
- COOLING SYSTEMS; ENRICHED URANIUM REACTORS; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTORS; TESTING; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WATER TREATMENT; WWER TYPE REACTORS
Optional Information
- Notes
- Imprint:Den jaderne energetiky.;Konference CSVTS.