Published June 2017
| Version v1
Journal article
Introduction of a probabilistic approach to leak before break demonstration
Creators
- 1. China Nuclear Power Engineering Co. Ltd., Shenzhen (China)
- 2. Nuclear and Radiation Safety Center, MEP, Beijing (China)
Description
This paper presents the development of Leak Before Break method and its disadvantages in usage. Then this paper introduces a probabilistic approach to Leak Before Break demonstration, also presents its basic theory and analysis procedure in detail. This paper presents the leak and DEGB probabilities of coolant system for the nuclear plants in the USA. By the end, this paper introduces the current state and future work of probabilistic approach to Leak Before Break demonstration. (authors)
Additional details
Identifiers
Publishing Information
- Journal Title
- Nuclear Safety (Beijing)
- Journal Volume
- 16
- Journal Issue
- 2
- Journal Page Range
- p. 17-23, 49
- ISSN
- 1672-5360
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 51118816
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- COOLING SYSTEMS; LEAKS; NUCLEAR POWER PLANTS; PROBABILISTIC ESTIMATION; REVIEWS; USA
- Descriptors DEC
- CALCULATION METHODS; DEVELOPED COUNTRIES; DOCUMENT TYPES; ENERGY SYSTEMS; NORTH AMERICA; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- 5 figs., 2 tabs., 17 refs.; http://dx.doi.org/10.16432/j.cnki.1672-5360.2017.02.004