Published 1990 | Version v1
Journal article

Alarm response guidance and usage system

  • 1. Westinghouse Electric Corp., Pittsburgh, PA (United States)

Description

This paper reports on alarm response and usage system. There are currently hundreds of annunciators in a power plant control room, supplemented by hundreds of pages of alarm response procedures. It is extremely difficult for an operator to ascertain quickly the cause of an abnormality and react to it when several annunciators are active. In addition, even in the case when only one or two alarm tiles are active, the root cause of the problem may be unknown to the operator. If his response is delayed, a plant trip or equipment damage may result. Control system malfunctions may also create an abnormal condition, and simply placing the system in manual may mitigate the event. Again, if action is not taken quickly enough, a plant trip may occur

Additional details

Publishing Information

Journal Title
Proceedings of the American Power Conference
Journal Volume
52
Series
Proc. Am. Power Conf.
Journal Page Range
342-345
ISSN
0097-2126
CODEN
PAPWA

Conference

Title
52. American power conference.
Dates
23-25 Apr 1990.
Place
Chicago, IL (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
23022732
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS; S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALARM SYSTEMS; CONTROL ROOMS; DATA PROCESSING; DESIGN; NUCLEAR POWER PLANTS; PERFORMANCE; REACTOR CONTROL SYSTEMS; RECOMMENDATIONS
Descriptors DEC
CONTROL SYSTEMS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
CONF-9004133--.