Published 1990
| Version v1
Journal article
Alarm response guidance and usage system
- 1. Westinghouse Electric Corp., Pittsburgh, PA (United States)
Description
This paper reports on alarm response and usage system. There are currently hundreds of annunciators in a power plant control room, supplemented by hundreds of pages of alarm response procedures. It is extremely difficult for an operator to ascertain quickly the cause of an abnormality and react to it when several annunciators are active. In addition, even in the case when only one or two alarm tiles are active, the root cause of the problem may be unknown to the operator. If his response is delayed, a plant trip or equipment damage may result. Control system malfunctions may also create an abnormal condition, and simply placing the system in manual may mitigate the event. Again, if action is not taken quickly enough, a plant trip may occur
Additional details
Publishing Information
- Journal Title
- Proceedings of the American Power Conference
- Journal Volume
- 52
- Series
- Proc. Am. Power Conf.
- Journal Page Range
- 342-345
- ISSN
- 0097-2126
- CODEN
- PAPWA
Conference
- Title
- 52. American power conference.
- Dates
- 23-25 Apr 1990.
- Place
- Chicago, IL (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23022732
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ALARM SYSTEMS; CONTROL ROOMS; DATA PROCESSING; DESIGN; NUCLEAR POWER PLANTS; PERFORMANCE; REACTOR CONTROL SYSTEMS; RECOMMENDATIONS
- Descriptors DEC
- CONTROL SYSTEMS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-9004133--.