Resilience improvements to UK nuclear power plants
Description
Following the events at Fukushima, the Office for Nuclear Regulation (ONR), the UK nuclear safety regulator, undertook a series of reviews into the resilience of UK nuclear power plants to severe events. These reviews highlighted a number of areas in relation to electrical infrastructure where it considered licensees should review their arrangements, considering both onsite and offsite infrastructure as well as the ability to recover following a complete loss of site infrastructure. In response, UK licensees have been exploring four parallel approaches to improving the resilience for each of their sites. Firstly, through modifications on-site such as enhancements to the installed diesel generators and related systems. Secondly through improvements to the resilience of essential instrumentation to Station Black Out events. Thirdly, through the provision of off-site backup equipment that can be deployed to any site following a severe event. Finally, the provision of event qualified connection points on site to enable timely restoration of long term essential electrical supplies and cooling to key systems. This last item gives a central focus to the issues of switchboard availability and the resilience of the whole network to large potentially common cause internal and external hazards. This paper will discuss the electrically related findings of the ONR reviews, explore the reasoning behind those decisions, and describe the approaches being taken by UK licensees. (authors)
Files
46066633.pdf
Files
(1.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:bdab6917fa18c547e40c18e5a9ea3ce0
|
1.2 MB | Preview Download |
Additional details
Publishing Information
- Imprint Title
- Robustness of Electrical Systems of Nuclear Power Plants in Light of the Fukushima Daiichi Accident (ROBELSYS). Workshop Proceedings, Paris, France, 1-4 April 2014. Appendix 2 (Cont'd) and Appendix 3 - Robustness of Electrical Systems of NPP's in Light of the Fukushima Daiichi Accident. ROBELSYS Workshop Proceedings. Appendices 2 and 3
- Imprint Pagination
- 362 p.
- Journal Page Range
- p. 164-184
- Report number
- NEA-CSNI-R--2015-4-ADD1
Conference
- Title
- ROBELSYS Workshop on the Robustness of Electrical Systems of NPP's in Light of the Fukushima Daiichi Accident
- Dates
- 1-4 Apr 2014
- Place
- Paris (France)
INIS
- Country of Publication
- Nuclear Energy Agency of the OECD (NEA)
- Country of Input or Organization
- Nuclear Energy Agency of the OECD (NEA)
- INIS RN
- 46066633
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S42: ENGINEERING;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AVAILABILITY; ELECTRIC GENERATORS; EMERGENCY PLANS; FLOOD CONTROL; MITIGATION; NUCLEAR POWER PLANTS; OUTAGES; PORTABLE EQUIPMENT; POWER SUPPLIES; POWER TRANSMISSION LINES; PUMPS; REACTOR SAFETY; RECOMBINERS; RECOMMENDATIONS; RELIABILITY; SAFETY MARGINS; WATERPROOFING
- Descriptors DEC
- CONTROL; ELECTRICAL EQUIPMENT; ELECTRONIC EQUIPMENT; EQUIPMENT; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; THERMAL POWER PLANTS