Published February 2015 | Version v1
Report Restricted

Disassembly of the NBI system on JT-60U for JT-60 SA

  • 1. Japan Atomic Energy Agency, Sector of Fusion Research and Development, Naka Fusion Institute, Naka, Ibaraki (Japan)
  • 2. Nippon Advanced Technology Co., Ltd., Tokai, Ibaraki (Japan)
  • 3. Nuclear Engineering Co., Ltd., Tokai, Ibaraki (Japan)

Description

According to the project plan of JT-60 Super Advanced that is implemented as an international project between Japan and Europe, the neutral beam (NB) injectors have been disassembled. The disassembly of the NB injectors started in November, 2009 and finished in January, 2012 without any serious problems as scheduled. This report presents the disassembly activities of the NB injectors. (author)

Availability note (English)

Available from JAEA; DOI: https://doi.org/10.11484/jaea-technology-2014-042

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

System files (187.5 kB)

Name Size Download all

Additional details

Publishing Information

Imprint Pagination
86 p.
Report number
JAEA-Technology--2014-042

Optional Information

Notes
5 refs., 40 figs., 16 tabs.