Published June 23, 2004 | Version v1
Report

SPEAR3 LARGE DC MAGNET POWER SUPPLIES

Description

The Stanford Synchrotron Radiation Laboratory (SSRL) has successfully commissioned SPEAR3, its newly upgraded 3-GeV synchrotron light source. First stored beam occurred December 15, 2003 and 100mA operation was reached on January 20, 2004. This paper describes the specification, design, and performance of the SPEAR3 DC magnet large power supplies (LGPS) that consist of tightly-regulated (better than ±10 ppm) current sources ranging from 100A to 225A and output powers ranging from 70kW to 135kW. A total of 6 LGPS are in successful operation and are used to power strings of quadrupoles and sextupoles. The LGPS are isolated by a delta/delta-wye 60Hz step-down transformer that provides power to 2 series-connected chopper stages operating phase-shifted at a switching frequency of 18-kHz to provide for fast output response and high efficiency. Also described are outside procurement aspects, installation, in-house testing, and operation of the power supplies

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/827011-xHrmZg/native/

Additional details

Publishing Information

Imprint Pagination
[vp.]
Report number
SLAC-PUB--10513

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
35104134
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
DESIGN; EFFICIENCY; LIGHT SOURCES; MAGNETS; PERFORMANCE; POWER SUPPLIES; PROCUREMENT; QUADRUPOLES; SYNCHROTRON RADIATION; SYNCHROTRONS; TESTING; TRANSFORMERS
Descriptors DEC
ACCELERATORS; BREMSSTRAHLUNG; BUSINESS; CYCLIC ACCELERATORS; ELECTRICAL EQUIPMENT; ELECTROMAGNETIC RADIATION; ELECTRONIC EQUIPMENT; EQUIPMENT; MULTIPOLES; RADIATION SOURCES; RADIATIONS

Optional Information

Contract/Grant/Project number
AC03-76SF00515
Funding organization
USDOE Office of Science (United States)