Proposal of modification of the Atucha I nuclear power plant's emergency power supply system

  • 1. ENACE S.A., Buenos Aires (Argentina)

Description

The emergency power supply system of Atucha I N.P.P. consists of three 50% diesel generators. During the transient from normal power supply to emergency power supply (approximately 15 seconds) an hydraulic generator takes care of the emergency system. By this way, the emergency busbars constitute themselves an interruption free system. The two emergency busbars work normally coupled. This proposal consists of the following modifications: 1) Add a new diesel generator in order to allow the operation with two diesel generators per busbar. 2) To work with the two emergency busbars not coupled as normal operation mode. 3) To eliminate the hydraulic generator from the emergency power supply system, in order to simplify the operation and to reduce the failure possibility. Without the hydraulic turbine generator, the emergency busbars loose the interruption free condition. For this reason, for the loads that are not able for this mode of operation and are connected to the emergency power supply system, two additional low-voltage interruption free busbars are necessary. Finally, this proposal is compared with the Atucha II N.P.P. emergency power supply system. (Author)

Availability note (English)

Available from Comision Nacional de Energia Atomica, Buenos Aires (AR). Library.

Additional details

Additional titles

Original title (Spanish)
Propuesta de modificacion del sistema electrico de emergencia de la CNA I

Publishing Information

Imprint Pagination
20 p.

Conference

Title
17. Annual meeting of the Argentine Association of Nuclear Technology.
Original Conference Title
17. Reunion anual de la Asociacion Argentina de Tecnologia Nuclear
Dates
4-7 Dec 1989.
Place
Buenos Aires (Argentina).

Optional Information

Notes
Pre-conference paper.