Published April 1996
| Version v1
Report
Report on the 1995 operation of reactor LVR-15
Description
The following activities were associated with the operation of the reactor in 1995: irradiation of a BWR water loop and probes; reactor power increase to 10 MW; start of permanent operation; use of fuel from the Skoda reactor; start of transition to 36% enrichment fuel; experimental fueling using 2 assemblies with 36% enrichment; preparation of documentation for transition to 36% enrichment fuel; installation of new equipment (facility for Si crystals, reactor information system, attachment for neutron capture therapy); modification of the RSV-3 water loop; start-up of a new high-level radioactive waste storage facility and start of transport of spent fuel from the reactor to this facility
Availability note (English)
Available from Nuclear Research Institute Rez, 250 68 Rez, Czech Republic.Additional details
Additional titles
- Original title (Czech)
- Zprava o provozu reaktoru LVR-15 v roce 1995
Publishing Information
- Imprint Pagination
- [33 p.].
- Report number
- UJV--10669-T
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Czech Republic
- INIS RN
- 29006833
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- LVR-15 REACTOR; NUCLEAR FUELS; REACTOR MAINTENANCE; REACTOR OPERATION; RESEARCH PROGRAMS
- Descriptors DEC
- ENERGY SOURCES; EXPERIMENTAL REACTORS; FUELS; MAINTENANCE; MATERIALS; OPERATION; REACTOR MATERIALS; REACTORS; RESEARCH AND TEST REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; ZERO POWER REACTORS
Optional Information
- Notes
- 9 tabs., 1 fig.