Published 1976
| Version v1
Journal article
Commission of the ASEA-ATOM boiling water reactor Oskarshamn 2
Description
AB ASEA-ATOM's boiling water reactor Oskarshamn 2 was handed over to the customer on shedule on the 15th December, 1974, after one week of continuous power operation. This article gives an account of the design and technical data of the reactor and of the tests performed in conjunction with the commissioning. (author)
Additional details
Publishing Information
- Journal Title
- ASEA (Allm. Sven. Elektr. A.B.) J.
- Journal Volume
- 49
- Journal Issue
- 1
- Series
- ASEA (Allm. Sven. Elektr. A.B.) J.
- Journal Page Range
- 3-8
INIS
- Country of Publication
- Sweden
- Country of Input or Organization
- Sweden
- INIS RN
- 8335272
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- AVAILABILITY; CONSTRUCTION; OKG-2 REACTOR; PERFORMANCE; REACTOR START-UP; TESTING
- Descriptors DEC
- BWR TYPE REACTORS; ENRICHED URANIUM REACTORS; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS