Published February 1985 | Version v1
Journal article

All zirconium tubes to be replaced at Pickering units 1 and 2

Creators

Description

Necessity of complete replacement of zirconium fuel channels at the Pickering-1 and Pickering-2 reactors near Toronto is substantiated. It is concluded that the fuel channel failure resulted from enhanced hydrogenation and hydride swellings due to the contact, between a calender tube an a fuel channel. It is noted that after fuel channel replacement the Pickering NPP will have two reactors renewed to a considerable degree

Additional details

Additional titles

Original title (Russian)
Замена циркониевых труб на AEhS ''пикерингь

Publishing Information

Journal Title
At. Tekh. Rubezhom
Journal Issue
no.2
Series
At. Tekh. Rubezhom.
ISSN
0320-9326
CODEN
ATRUA

Optional Information

Notes
Abridged translation from English: Nuclear Engineering International, 1984, v. 29(355), p. 15-20.