Engineering task plan for BX/BY compressor upgrade

Description

This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ''BX-BY Compressor Upgrade'' dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95007792; NTIS; US Govt. Printing Office Dep.

Files

26060614.pdf

Files (808.0 kB)

Name Size Download all
md5:0a5386f18810a182776ed31c611ee458
808.0 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
20 p.
Report number
WHC-SD--WM-ETP-058

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).