Serbian SNF Repatriation Operation. Issues, Solving, Lesson

Creators

  • 1. Research and Development Company 'Sosny', Moscow (Russian Federation)

Description

For now the removal of SNF from RA reactor site (PC NFS, Serbia) is the most time-consuming and technically complicated operation under RRRFR Program. The most efficient techniques and lessons learned from other projects of the RRRFR Program as well as new unique technical decisions were used. Two big challenges were resolved during implementation of Serbian Project: (1) preparation of damaged fuel located in the packages unsuitable for transport, taking into account insufficient infrastructure of RA reactor site and (2) removal of large amount of fuel in one multimodal shipment through several transit countries. The main attention was paid to safety justification of all activities. All approvals were obtained in Russia, Serbia and transit countries. Special canisters were designed for transportation of specific RA reactor fuel (of small dimensions, unidentifiable, damaged due to corrosion). The canister design was selected to be untight - it was the most expedient decision for that case from safety perspective. The technology and a set of equipment were designed for remote removal of the fuel from the existing package (aluminum barrels and reactor channels) and placing of the fuel into the new canisters. After fabrication and assembling of the equipment theoretical and practical training of the personnel was performed. Fuel repackaging took about 5 months. SNF was transported in TUK-19 and SKODA VPVR/M casks. The baskets of large capacity were designed and fabricated for SKODA VPVR/M casks. Special requirements to drying the packages and composition of gaseous medium inside were justified to ensure fire and explosion safety. Specialized ISO-containers and transfer equipment designed under Romanian Project were used together with TUK-19 casks. A forklift and mobile rail system were used to handle SKODA VPVR/M casks under conditions of low capacity of the cranes at the facility. Due to the tight schedule of RRRFR Program as well as geographical peculiarities of RA reactor site location all types of transport means were used in this transportation: empty casks were delivered by road and air, SNF was transported by road, rail and sea. The success of the Serbian Project is the result of professionalism and efficient cooperation of many national and international organizations. The lessons learned are useful and could be used in other projects of fuel removal and decommission of nuclear facilities. (author)

Part of:
RRFM (European Research Reactor Conference) 2011 Transactions

Additional details

Publishing Information

ISBN
978-92-95064-11-9
Imprint Title
RRFM (European Research Reactor Conference) 2011 Transactions
Imprint Pagination
753 p.
Journal Page Range
p. 243-247
Report number
INIS-BE--11N0031

Conference

Title
15. International Topical Meeting on Research Reactor Fuel Management (RRFM)
Acronym
RRFM (European Research Reactor Conference) 2011
Dates
20-24 Mar 2011
Place
Rome (Italy)

Optional Information

Notes
4 figs