Published October 1997 | Version v1
Miscellaneous

Document status for 1 and 2 Kozloduy NPP decommissioning activities -Phase 'Final Shutdown'

  • 1. Kombinat Atomna Energetika, 3321 Kozloduj (Bulgaria)

Description

Decommissioning process (D and D) is the final phase of each nuclear reactor life cycle. The first nuclear reactor generation has reached his expiration life date. Decommissioning working documentation had not been taken into account at the project and construction stage. The decommissioning activities, planning and legislation has to develop along their operation. Most of developed nuclear energetic countries have gathered good experience and have create their own decommissioning strategy. This report represents in brief an overview of different country's approaches and the Kozloduy NPP decommissioning activity intention in near future and reviews the D and D working document status for 1 and 2 Kozloduy NPP Units decommissioning. Kozloduy NPP D and D task to the moment is to plan the first stage of the decommissioning process - 'The Final Shutdown' and to prepare the working documents for the phase execution. The Final Shutdown of Kozloduy NPP - 1 is the termination of operation of the Units 1 and 2 and the electricity production cessation after their useful life exhaust. In accordance with the legal legislation in Bulgaria only the normal planned termination of operation on units 1 and 2 should be prescribed. The project results concern the initial condition of the equipment and systems, their preparation and sequence for defueling, decontamination and dismantling. A plan for activities' organization for D and D and Complex Characterization of the Site under consideration will contain the following documents: 1. Time-schedule for the sequence of activities during the stages of the Final Shutdown and Safe Enclosure preparation. Technical project for organization of work related to Final Shutdown; 2. Complex Characterization Programme for a condition investigation of the Units 1 and 2 equipment and systems. 3. Technical project for design modifications and dismantling of equipment and systems which violate the radiation and nuclear safety during the Final Shutdown phase. Decontamination before and Conservation; 4. List and content of the documentation for development of the Kozloduy NPP-1 Safe Enclosure Programme. (authors)

Availability note (English)

Available from the author(s) or Energy Info-Documentation Centre, Roma-nian Electricity Authority, RENEL - Engineering Studies and Research Group, Bldv.Energeticienilor No.8, Sector 3, R-79619 Bucharest (RO).
Part of:
SIEN'97 - International Symposium on Nuclear Energy. Radioactive Waste Management

Additional details

Publishing Information

Publisher
Energy Info-Documentation Centre.
Imprint Place
Bucharest (Romania)
Imprint Title
SIEN'97 - International Symposium on Nuclear Energy. Radioactive Waste Management
Imprint Pagination
346 p.
Journal Page Range
(pt.1) p. 144.

Conference

Title
Radioactive Waste Management.
Acronym
SIEN'97 - International Symposium on Nuclear Energy
Dates
24-25 Oct 1997.
Place
Bucharest (Romania).

Optional Information

Notes
Imprint:Proceedings published in two parts.