Reliability of equipment of V-213 units

  • 1. Atomova Elektraren Bohunice, Jaslovske Bohunice (Czechoslovakia)

Description

Tabulated are data on operating reliability of units of the V-1 and V-2 nuclear power plants in Jaslovske Bohunice in the year 1985 and in the first half of 1986. Insofar as the electric equipment and the system of measurement and control are the most complex and the most failure prone, data on these failures are given in detail. In the said period there were 47 failures in the system of measurement and control and 59 failures of the electric equipment. Briefly presented is the first experience with the introduction of the SIS reliability information system in all units of the V-1 and V-2 power plants. (Z.M.). 6 tabs

Availability note (English)

Available from Atomove elektrarne Bohunice, Jaslovske Bohunice, Czechoslovakia.

Additional details

Additional titles

Original title (Slovak)
Spolahlivost zariadenia blokov V-213

Publishing Information

Imprint Pagination
20 p.

Conference

Title
Conference on commissioning of nuclear power plant V-2 and experience with its operation.
Original Conference Title
Uvadzanie do prevadzky a skusenosti z prevadzky JE V-2
Dates
11-13 Nov 1986.
Place
Podbanske (Czechoslovakia).

INIS

Country of Publication
Serbia and Montenegro
Country of Input or Organization
Serbia and Montenegro
INIS RN
19046214
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BOHUNICE V-1 REACTOR; BOHUNICE V-2 REACTOR; ELECTRICAL EQUIPMENT; FAILURES; OUTAGES; REACTOR INSTRUMENTATION; REACTOR MONITORING SYSTEMS; REACTOR OPERATION; RELIABILITY
Descriptors DEC
ENRICHED URANIUM REACTORS; EQUIPMENT; OPERATION; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS

Optional Information

Notes
24.0.