Published 1992
| Version v1
Journal article
Electronic transfers save time and money for FGD project
Description
This paper reports that in order to support the numerous construction projects that PSI Energy is currently engaged in, particularly the FGD (Flue Gas Desulfurization) Project at Gibson, it was decided to establish hardware, software, and procedures that would help shorten the project completion time. This would be accomplished by reducing the review times at PSI Energy for drawings and specifications received from the architect/engineer. The FGD Project, which uses Chicago-based Sargent and Lundy (S and L) as the primary architect/engineer and which involves construction at the Gibson Generating Station, was to be the pilot project for putting this system in place
Additional details
Publishing Information
- Journal Title
- Proceedings of the American Power Conference
- Journal Volume
- 54
- Journal Issue
- 1
- Journal Page Range
- p. 1343-1350.
- ISSN
- 0097-2126
- CODEN
- PAPWA2
Conference
- Title
- 54. annual American power conference.
- Dates
- 13-15 Apr 1992.
- Place
- Chicago, IL (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 24001125
- Subject category
- S20: FOSSIL-FUELED POWER PLANTS; S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- AIR POLLUTION CONTROL; COMPUTER CODES; DESIGN; DESULFURIZATION; ENVIRONMENTAL POLICY; FOSSIL-FUEL POWER PLANTS; FUEL GAS; PILOT PLANTS; PLANNING; POWER GENERATION; SPECIFICATIONS; WASTE MANAGEMENT
- Descriptors DEC
- CHEMICAL REACTIONS; CONTROL; ENERGY SOURCES; FLUIDS; FUELS; FUNCTIONAL MODELS; GAS FUELS; GASES; MANAGEMENT; POLLUTION CONTROL; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Secondary number(s)
- CONF-920432--.