Published March 1980
| Version v1
Report
Open
Qualification of the B and W Mark B fuel assembly for high burnup. Third semi-annual progress report, July-December 1979
Description
Five Babcock and Wilcox-designed Mark B (15 x 15) pressurized water reactor fuel assemblies were irradiated to extended burnups in Duke Power Company's Oconee Unit 1 reactor. An assembly average burnup of 40,000 MWd/mtU, which is about 29% greater than previous discharge burnups at Oconee 1, was attained. The nondestructive examination of these five assemblies, which have been irradiated for four fuel cycles, was begun. Data obtained included fuel assembly and fuel dimensions, water channel spacings, fuel rod surface deposit samples, and holddown spring preload forces. Visual examination of the assemblies indicated that good fuel performance was maintained through four cycles of irradiation
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A06/MF A01.Files
12592545.pdf
Files
(10.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:6d87213f55014436851d987989e1cc86
|
10.1 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 121 p.
- Report number
- DOE/ET/34212--27
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 12592545
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- BURNUP; FUEL ASSEMBLIES; FUEL ELEMENT FAILURE; INSPECTION; OCONEE-1 REACTOR; PERFORMANCE; RESEARCH PROGRAMS
- Descriptors DEC
- ACCIDENTS; ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTOR ACCIDENTS; REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS