Published 2011 | Version v1
Miscellaneous

Study of power source transfer time criteria for Ling'Ao NPP phase II

Creators

  • 1. China Guangdong Nuclear Power Engineering Company, Shenzhen (China)

Description

The solution for source transfer time beyond criteria problem in LingAo project II is introduced in the paper. System is modified and criteria are updated. Analysis and tests are performed to get proper parameter. International rules are used to evaluate the new criteria. The problem is solved finally, contributing stable power supply to unit pre-peration, start-up and operation. Experience also gathered for CPR1000 new projects. (author)

Part of:
Proceedings of the ICONE-19. The 19th international conference on nuclear engineering

Additional details

Publishing Information

Imprint Title
Proceedings of the ICONE-19. The 19th international conference on nuclear engineering
Imprint Pagination
[3427 p.]
Journal Page Range
[4 p.]

Conference

Title
19. international conference on nuclear engineering
Acronym
ICONE-19
Dates
24-25 Oct 2011
Place
Osaka (Japan)

Optional Information

Notes
Available as CD-ROM Data in PDF format, Paper ID: ICONE19-43058.pdf; 3 refs., 4 figs., 7 tabs.