Published October 1987 | Version v1
Report Restricted

GES [Ground Engineering System] test site preparation

Description

Activities are under way at Hanford to convert the 309 containment building and its associated service wing to a nuclear test facility for the Ground Engineering System (GES) test. Conceptual design is about 80% complete, encompassing facility modifications, a secondary heat transport system, a large vacuum system, a test article cell and handing system, control and data handling systems, and safety andl auxiliary systems. The design makes extensive use of existing equipment to minimize technical risk and cost. Refurbishment of this equipment is 25% complete. Cleanout of some 1000 m3 of equipment from the earlier reactor test in the facility is 85% complete. An Environmental Assessment was prepared and revised to incorporate Department of Energy (DOE) comments. It is now in the DOE approval chain, where a Finding of No Significant Impact is expected. During the next year, definite design will be well advanced, long-lead procurements will be initiated, construction planning will be completed, an operator training plan will be prepared, and the site (preliminary) safety analysis report will be drafted

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A03/MF A01; 1 as DE88004468.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
WHC-SA--0123-FP

Conference

Title
4. symposium on space nuclear power systems.
Dates
12-16 Jan 1987.
Place
Albuquerque, NM (USA).

Optional Information

Notes
Portions of this document are illegible in microfiche products.
Secondary number(s)
CONF-870102--31.