Published 1989
| Version v1
Book
Successful nuclear project management through cooperation between manufacturers and electric utilities
Description
In Finland and Sweden 16 nuclear power units are in operation. Il of these are BWRs delivered by ABB Atom. From the first order in 1966 there has been a unique cooperation between the manufacturers and the utilities. This applies to the reactor and fuel design, construction and maintenance planning. The results of the cooperation can be seen in short construction periods (less than 5 years), high availabilities and low radiation doses. All these factors sum up to an extremely good economy for all the Nordic BWR plants
Additional details
Publishing Information
- Publisher
- Organisation for Economic Co-Operation and Development.
- Imprint Place
- Paris (France)
- ISBN
- 92-64-03239-8
- Imprint Title
- Good performance in nuclear projects
- Imprint Pagination
- 785 p.
- Journal Page Range
- p. 255-265.
Conference
- Title
- International Symposium on Achievement of Good Performance in Nuclear Projects.
- Dates
- 17-20 Apr 1989.
- Place
- Tokyo (Japan).
INIS
- Country of Publication
- France
- Country of Input or Organization
- Nuclear Energy Agency of the OECD (NEA)
- INIS RN
- 21054043
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BWR TYPE REACTORS; COOPERATION; ELECTRIC UTILITIES; FABRICATION; FINLAND; REACTOR COMPONENTS; SWEDEN
- Descriptors DEC
- DEVELOPED COUNTRIES; ENRICHED URANIUM REACTORS; EUROPE; POWER REACTORS; PUBLIC UTILITIES; REACTORS; SCANDINAVIA; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS