Published May 6, 2005 | Version v1
Report

PEP-II: An Asymmetric B Factory Based on PEP

Description

An asymmetric B Factory to be installed in the PEP tunnel has been under study at SLAC, LBL, and LLNL for several years [1-4]. A mature design for a 9 GeV x 3.1 GeV electron-positron collider with a design luminosity of 3 x 1033 cm-2s-1 is presented. Solutions now exist for all the technical problems, including issues related to high currents (e.g., beam instabilities, feedback systems, vacuum chamber design, lifetime degradation, and radiation power dissipation in the interaction region) and those related to different energies of the beams (e.g., beam separation, beam-beam interaction, and detector requirements). The status of this project, which is being proposed for funding in FY 1993, is discussed

Availability note (English)

Available from http://www.slac.stanford.edu/cgi-wrap/getdoc/slac-pub-11103.pdf; http://www.slac.stanford.edu/cgi-wrap/pubpage?slac-pub-11103.html; PURL: https://www.osti.gov/servlets/purl/890880-XyCSSs/

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
SLAC-PUB--11103

Conference

Title
Prepared for IEEE 1991 Particle Accelerator Conference (APS Beam Physics)
Dates
6-9 May 1991
Place
San Francisco, CA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
39001745
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; BEAM-BEAM INTERACTIONS; DESIGN; FEEDBACK; LAWRENCE BERKELEY LABORATORY; LAWRENCE LIVERMORE NATIONAL LABORATORY; LIFETIME; LUMINOSITY; PHYSICS; RADIATIONS; STANFORD LINEAR ACCELERATOR CENTER
Descriptors DEC
NATIONAL ORGANIZATIONS; OPTICAL PROPERTIES; PHYSICAL PROPERTIES; US AEC; US DOE; US ERDA; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC02-76SF00515
Funding organization
US Department of Energy (United States)