Project W-320, 241-C-106 sluicing electrical calculations, Volume 2
Description
This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050909; NTIS; US GOVT. PRINTING OFFICE DEP.Files
30046649.pdf
Files
(3.9 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:fbadc4ce5244ec4b185f4509b10de6ee
|
3.9 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 143 p.
- Report number
- HNF--2488
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30046649
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CALCULATION METHODS; POWER SYSTEMS; RADIOACTIVE WASTE STORAGE; SPECIFICATIONS; STORAGE FACILITIES; WASTE RETRIEVAL
- Descriptors DEC
- ENERGY SYSTEMS; MANAGEMENT; STORAGE; WASTE MANAGEMENT; WASTE STORAGE
Optional Information
- Contract/Grant/Project number
- Contract AC06-96RL13200
- Funding organization
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)