Published August 7, 1998 | Version v1
Report Open

Project W-320, 241-C-106 sluicing electrical calculations, Volume 2

Description

This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050909; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

30046649.pdf

Files (3.9 MB)

Name Size Download all
md5:fbadc4ce5244ec4b185f4509b10de6ee
3.9 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
143 p.
Report number
HNF--2488