Published 2016 | Version v1
Miscellaneous

EPRI Software for Estimating Decommissioning Waste Volumes - 16046

  • 1. Electric Power Research Institute, 3420 Hillview Ave., Palo Alto, California (United States)

Description

EPRI has adapted computer software that can estimate the volume and activity content of waste resulting from the dismantlement of nuclear facilities. This software, designated as Automatic Estimation of the Radiological Inventory or AERI, was originally developed by Iberdrola for use by ENRESA in Spain. The software estimates the radiological inventory for all the components and civil structures of the plant or other facility that are included in the physical inventory. The radiological inventory shows the internal and external surface contamination, as well as the volumetric contamination. The processes of the software are able to estimate both the specific activity levels (in Bq/g or pCi/g) for each radionuclide and the surface activity (Bq/cm2 or dpm/100 cm2) for components and civil structures located in the radiological areas. AERI allows the user to extrapolate, through a statistical approach, the contamination levels obtained by sampling data in specific components and civil structures to the entire facility. The main benefits and values obtained with AERI are the following: - The radiological inventory of the plant can be obtained from a limited set of radiological sampling data. Using the mathematical models allows for the optimization of the number of sampling and analysis that needs to be done. The uncertainties of the calculations are reduced with more data. The user must balance the level of uncertainty of the calculations and the number of sample data they will use. - The automatic management of radiological data in short computing times allows for the execution of several scenarios in a reasonable time. Therefore, different radioactive waste and decommissioning hypotheses can be tested. For example, inventory and data can be split into two different set. One of them can be used for obtaining radiological inventory for early dismantling (3 years, as example) and the second one for deferred dismantling (25 years.) - The software supports the planning and implementation of decommissioning strategies for nuclear plants. For instance, several decontamination factors can be evaluated, assuming different level for decontamination of materials, and results for materials from several streams and use of different container types may be included in each evaluation. (authors)

Availability note (English)

Available from: WM Symposia, Inc., PO Box 27646, 85285-7646 Tempe, AZ (US)

Additional details

Publishing Information

Imprint Pagination
6 p.
Report number
INIS-US--19-WM-16046

Conference

Title
42. Annual Waste Management Symposium
Acronym
WM2016
Dates
6-10 Mar 2016
Place
Phoenix, AZ (United States)

Optional Information

Notes
2 refs.; available online at: http://archive.wmsym.org/2016/index.html