Published 1987 | Version v1
Book

Development of an emergency procedure guideline for station blackout for the Combustion Engineering owners group

  • 1. Northeast Nuclear Energy Co., Millstone Nuclear Power, Waterford, CT (USA)
  • 2. Combustion Engineering, Inc., Windsor, CT (United States)

Description

A strategy for operator response to station blackout events has been developed. This strategy optimizes the control of RCS heat removal rate by indexing it to the RCS leak rate as indicated by changes in the RCS subcooled margin. Optimum reactor operator control of steam and feed flow rates is based on maintaining RCS subcooling in the range of 11.1 - 27.8 degrees C (20-50 degrees F)

Additional details

Publishing Information

Publisher
American Nuclear Society.
Imprint Place
La Grange Park, IL (USA)
ISBN
0-89448-136-3
Imprint Title
Anticipated and abnormal transients in nuclear power plants
Imprint Pagination
vp.
Journal Page Range
p. IV-42-IV-46.

Conference

Title
Topical meeting on anticipated and abnormal transients in nuclear power plants.
Dates
12-15 Apr 1987.
Place
Atlanta, GA (USA).

Optional Information

Secondary number(s)
CONF-870418--.