Published 1990 | Version v1
Report Open

Investigation of the IHEP proton synchrotron beam debunching during interaction with a thin internal target

Description

The results of the computer simulations of the accelerating beam interaction with a thin internal carbon target at a partially filled orbit on the magnetic field flat top are presented. The mechanisms of the beam debunching in the dependence on the negative or positive coordinates of the target from the central orbit were considered. The results of calculating the influence of the bunch form on the time and depth of beam debunching after fast extraction (FE) as well as the presence of 200 HF kHz structure connected with it are presented. The experimental data on the thin target positive influence on the beam debunching process after FE and diminiting of the 200 kHz structure in extracted beams are given. 8 refs.; 4 figs

Availability note (English)

MF available from INIS under the Report Number.

Files

23001825.pdf

Files (313.6 kB)

Name Size Download all
md5:3015e2796522eacfb05de6d6bdebcb4d
313.6 kB Preview Download

System files (30.2 kB)

Name Size Download all

Additional details

Additional titles

Original title (Russian)
Исследование разбанчировки пучка протонного синхротрона IFVEh при взаимодействии с тонкой внутренней мишенью

Publishing Information

Imprint Pagination
10 p.
Report number
IFVE-OKU--90-52