Published January 15, 2002 | Version v1
Report

Wabash River Coal Gasification Repowering Project: A DOE Assessment; FINAL

Description

The goal of the U.S. Department of Energy (DOE) Clean Coal Technology Program (CCT) is to furnish the energy marketplace with a number of advanced, more efficient, and environmentally responsible coal utilization technologies through demonstration projects. These projects seek to establish the commercial feasibility of the most promising advanced coal technologies that have developed beyond the proof-of-concept stage. This document serves as a DOE post-project assessment (PPA) of a project selected in CCT Round IV, the Wabash River Coal Gasification Repowering (WRCGR) Project, as described in a Report to Congress (U.S. Department of Energy 1992). Repowering consists of replacing an existing coal-fired boiler with one or more clean coal technologies to achieve significantly improved environmental performance. The desire to demonstrate utility repowering with a two-stage, pressurized, oxygen-blown, entrained-flow, integrated gasification combined-cycle (IGCC) system prompted Destec Energy, Inc., and PSI Energy, Inc., to form a joint venture and submit a proposal for this project. In July 1992, the Wabash River Coal Gasification Repowering Project Joint Venture (WRCGRPJV, the Participant) entered into a cooperative agreement with DOE to conduct this project. The project was sited at PSI Energy's Wabash River Generating Station, located in West Terre Haute, Indiana. The purpose of this CCT project was to demonstrate IGCC repowering using a Destec gasifier and to assess long-term reliability, availability, and maintainability of the system at a fully commercial scale. DOE provided 50 percent of the total project funding (for capital and operating costs during the demonstration period) of$438 million. Construction for the demonstration project was started in July 1993. Pre-operational tests were initiated in August 1995, and construction was completed in November 1995. Commercial operation began in November 1995, and the demonstration period was completed in December 1999. The independent evaluation contained herein is based primarily on information provided in Wabash's Final Report (Dowd 2000), as well as other references and bibliographic sources

Availability note (English)

Available from OSTI as DE00792591

Additional details

Publishing Information

Imprint Pagination
294 Kilobytes
Report number
DOE/NETL--2002/1165

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33054971
Subject category
S01: COAL, LIGNITE, AND PEAT; S20: FOSSIL-FUELED POWER PLANTS;
Resource subtype / Literary indicator
Non-conventional Literature
Descriptors DEI
COAL GASIFICATION; COMBINED-CYCLE POWER PLANTS; FOSSIL-FUEL POWER PLANTS; INDIANA; JOINT VENTURES; OPERATING COST; RETROFITTING; US CLEAN COAL TECHNOLOGY PROGRAM
Descriptors DEC
COOPERATION; COST; DEVELOPED COUNTRIES; GASIFICATION; NORTH AMERICA; POWER PLANTS; THERMAL POWER PLANTS; THERMOCHEMICAL PROCESSES; USA

Optional Information

Contract/Grant/Project number
NONE
Funding organization
US Department of Energy (United States)